Design Studies
|
Second Severn Crossing Study, UK, 1984-1986 |
|
|
w |
consultant to the UK Government, advising on the feasibility, procurement, design, construction, operation and maintenance of the Second Severn Crossing |
|
|
w |
cable-stayed, suspension bridge schemes and tunnel options |
|
|
|
|
Dartford Crossing (Queen Elizabeth II Bridge), UK, 1986 |
|
|
w |
consultant to local authorities and a contracting consortium, advising on possible crossing options, operation, finance and tolling |
|
|
w |
different cable-stayed bridge schemes and immersed tube tunnel options |
|
|
|
|
Oresund Link Design Study, Denmark-Sweden, 1993 |
|
|
w |
preliminary design of 12km long combined rail-road crossing |
|
|
w |
innovative forms of cable-stayed bridges, 7.5km of viaducts, 2.2km of immersed tube tunnels and an artificial island |
|
|
w |
environmental impact, cost, programming, operation and maintenance studies |
|
|
w |
one of six groups selected by Æresundkonsortiet to prepare preliminary design proposals |
|
|
|
|
Second Channel Fixed Link, England-France, 1999 |
|
|
w |
feasibility study of a proposed Second Fixed Link between England and France |
|
|
w |
all imaginable options including ultra long-span bridges, immersed tube tunnels and bored tunnels |
|
|
w |
consultant, in joint venture to Eurotunnel |
|
|
|
|
Lower Thames Crossing Study, UK, 1994 |
|
|
w |
consultant for detailed engineering feasibility and construction cost studies |
|
|
w |
various sites investigated |
|
|
w |
innovative cable-supported bridge options in the span range 800m - 2000m |
|
|
|
|
River Saigon Crossing, Vietnam, 1996-1997 |
|
|
w |
imaginative design of bridge and tunnel schemes subjected to severe site constraints |
|
|
w |
engineering, environmental impact, social, economic, operation, maintenance, funding and procurement studies |
|
|
w |
lead consultant for feasibility study |
|
|
|
|