Improvement to Hong Kong Central Mid Level and High Level Areas Water Supply – Remaining Works
WSD have appointed Maunsell-Metcalf & Eddy to undertake the detailed design and construction of the above scheme which involves the following works:
- Construct a New Hatton Road Fresh Water Service Reservoir and re-build the existing Hatton Road Fresh Water Service Reservoir
- Construct a new Kotewall Road Fresh Water Pumping Station
- Uprate existing Western Fresh Water Pumping Station
- Construct a new Peak Fresh Water Service Reservoir;
- Lay about 8,000m fresh water mains of diameters ranging from 200mm to 700mm and about 3,000m salt water mains of diameters ranging from 200mm to 450mm in Mid Level area.